logo INTEGRAIL

INTEGRAIL > Results

INTEGRAIL Results

Several different routes were used for testing INTEGRAIL:

INTEGRAIL Car Test

System Functional Test on Car: Test Route

System Functional Test on Car: Test Route

Fig. 1 (click image to enhance) -- System Functional Test on Car: Test Route

Car Test: Mobile Unit and Power Supply Set-Up

Car Test: Mobile Unit and Power Supply Set-Up

Fig. 2 (click image to enhance) -- Car Test: Mobile Unit and Power Supply Set-Up

Car Test: Antenna

Car Test: Antenna

Fig. 3 (click image to enhance) -- Car Test: Antenna

INTEGRAIL LogServ/CargoServ Test

CargoServ Test Area: Rural Line Track Linz--Steyrling

CargoServ Test Area: Rural Line Track Linz--Steyrling

Fig. 4 (click image to enhance) -- CargoServ Test Area: Rural Line Track Linz--Steyrling

Test Area of the VoestAlpine Steelwork Premises in Linz

CargoServ Test Track at VoestAlpine's Premises

Fig. 5 (click image to enhance) -- LogServ/CargoServ Tracks at VoestAlpine's Premises

CargoServ Locomotive

CargoServ Locomotive

Fig. 6 (click image to enhance) -- CargoServ Locomotive

Outside Installation

Antennas

Antenna Positions on the CargoServ Locomotive

Fig. 7 (click image to enhance) -- Antenna Positions on the CargoServ Locomotive

Odometer

Odometer on the CargoServ Locomotive

Fig. 8 (click image to enhance) -- Odometer on the CargoServ Locomotive

Inside Installation

INTEGRAIL Equipment

Fig. 9 (click image to enhance) -- INTEGRAIL aboard the CargoServ Locomotive

Copyright © 2003-2006 Kayser-Threde GmbH  ·  All rights reserved  ·  Imprint  ·  2006-09-12